TDV Consulting GmbH
 Dorian Janjic & Partner - Graz, Austria
 

Talübergang Schottwien Austria

Prestressed concrete bridge with four spans (142 m + 250 m + 162 m + 77 m). Calculation with non-linear geometry and non-linear material behaviour due to piers with 130 m height. Built using the balanced cantilevering method.



  • Contract:
    • Talübergang Schottwien Bridge, Austria
  • Consultant:
    • Dipl.-Ing. VOGLER, Wien, Austria
  • State of Construction:
    • Completed
  • TDV Involvement:
    • Bridge modeling
    • General advice on construction stage analysis
    • Nonlinear Structural Analysis for Construction Stage and Final Stage
    • Optimization of the stressing procedure for the tendons
    • Analysis of the final closure of the bridge
    • Full pre-camber calculation