57 Bridges on Main and Regional Roads Bosnia and Herzegovina





Bridge Design of 18 Standard Bridges

Preliminary and final design of three structures on bypass of Bugojno on main road M-16.4 Novi Travnik – Bugojno.
Client: P.C. Road directorate of FBiH; Contract duration: 12.03.2007 to 12.06.2007.

Investigation works and final design of three composite bridges (L1=180 m, L2=150 m, L3=300 m), on regional road R-445 Visoko – Kakanj as part of relocation of regional road due to construction of highway Zenica – Sarajevo, section Kakanj – Visoko.
Client: P.C. Road directorate of FBiH; Contract duration: 11.07.2006 to 11.11.2006.

Final design of reinforced concrete overpass on the bypass of Velika Kladuša.
Client: «Grupex» for P.C. Road directorate of FBiH; Contract duration: 22.02.2006 to 06.04.2006.

Final design checks:

  • Renewal of bridge across River Vrbas in Jajce on main road M-05.0;
  • A bridge across River Praca on main road M-05.0, section Hrenovica – Mesici;
  • A bridge across River Ujica on main road M-18.0;
  • A Bridge across River Ljubina on road M-18.0, km 96+553;
  • A Bridge across River Ljubina on road M-18.0 at km 92+244.
Client: P.C. Road directorate of FBiH; Contract duration: 03.09.2004 to 18.09.2004.

Design check of prestressed concrete bridge across River Sanica on regional road R-410, Sanica – Vrhpolje section.
Client: Ministry of economy of Unsko – sanski Canton; Contract duration: 27.07.2003 to 04.08.2003.

Geodetic bases, geo-surveys, preliminary and final design of bridge across River Idbašica on main road M-17 in Celebici, L=36 m (prestressed). Preliminary (composite and suspended variants) and final bridge design (composite) across Jablanicko lake in Celebici on regional road 418b, L=544 m.
Client: Elektroprivreda FBiH; Contract duration: 26.07.2002 to 24.03.2003.

Preliminary and final design of bridge “Ugar 3” across River Ugar on the regional road R 413 Skender Vakuf – Turbe, L=76.0 m (reinforced concrete).
Client: FBiH Roads Directorate; Contract duration: 18.02.2002 to 15.03.2002.

Final design of bridge across River Željeznica on the regional road R-437 Fojnica – Dusina, L=17.0 m (reinforced concrete).
Client: Cantonal ministry of transport and communications of Srednjobosanski Canton, Travnik; Contract duration: 07.09.2001 to 07.10.2001.

Design of building technology (scaffold, lining and mounting) and consulting services for composite bridge across River Una in Kulen Vakuf on regional road R-408b.
Client: G.P. Rad Cazin; Contract duration: 15.09.2000 to 01.11.2000.

Top


Bridge Rehabilitation Design of 30 Standard Bridges

Final design of bridge rehabilitation across railroad track Sarajevo – Ploce, spur track of western approach to City of Sarajevo and road Ilidža – Blažuj in Blažuj near Sarajevo on road M-17.0, section Stup – Jablanica, km 6+494.
Client: P.C. Road directorate of FBiH; Contract duration: 13.08.2007 to 13.11.2007.

Investigation works and final design of renewal of reinforced concrete overpass at Stup on main road M-18.0, section Sarajevo – Jablanica, 140.8 m length.
Client: P.C. Road directorate of FBiH; Contract duration: 11.09.2006 to 11.11.2006.

Investigation works and final design of renewal of five composite bridges (L=30.0 m) across River Ljubina on main road M-18.0, section Šicki Brod – Sarajevo.
Client: P.C. Road directorate of FBiH; Contract duration: 11.09.2006 to 11.11.2006.

Investigation works and final design of renewal of reinforced concrete bridge across River Una in Bihac on main road M-05.0, city bridge, km 13+344.
Client: P.C. Road directorate of FBiH; Contract duration: 04.05.2005 to 13.07.2005.

Investigation works and final design of renewal of reinforced concrete bridge across River Bosna in Plandište on main road M-17.0, section Sarajevo – Konjic, km 4+090.
Client: P.C. Road directorate of FBiH; Contract duration: 04.05.2005 to 13.07.2005.

Investigation works and final design of renewal of prestressed bridge across Drecelj Brook in Konjic on main road M-17, section: Sarajevo – Konjic, km 59+945.
Client: P.C. Road directorate of FBiH; Contract duration: 04.05.2005 to 29.06.2005.

Investigation works and final design of renewal of reinforced concrete bridge across River Drinjaca in Vitalj near Kladanj, on main road M-19.2, section Vlasenica – Vitalj, km 28+402.
Client: P.C. Road directorate of FBiH; Contract duration: 04.05.2005 to 20.07.2005.

Investigation works and final design of rebuilding of bridge over River Race and local road in Srednje on main road M-18 Šicki Brod – Sarajevo, L=88.6 m (reinforced concrete).
Client: FBiH roads directorate and SFOR; Contract duration: 22.04.2004 to 22.06.2004.

Investigation works and detailed design of rebuilding of bridge across River Drinjaca in Kladanj on main road M-18 Šicki Brod – Sarajevo, km 44+033, L=46.55 m (reinforced concrete).
Client: FBiH roads directorate and SFOR; Contract duration: 22.04.2004 to 22.06.2004.

Investigation works and final design of rebuilding viaduct on main road M-18 Šicki Brod – Sarajevo, km 41+514, L=67.15 m (reinforced concrete).
Client: FBiH roads directorate and SFOR; Contract duration: 22.04.2004 to 22.06.2004.

Final design of reconstruction and strengthening (improving the load bearing class) of bridge across the railway Vrhpolje – Sarajevo in Briješce on main road M-5, L=63.0 m (reinforced concrete).
Client: FBiH roads directorate; Contract duration: 09.03.2004 to 12.05.2000.

Detailed design of rebuilding of bridge across River Ljubina on the main road M 18.0-2, km 103+696, L= 30.0 m (Composite).
Client: FBiH Roads Directorate; Contract duration: 13.12.2003 to 20.02.2004.

Final design of rebuilding the bridge across River Ljubina on the main road M-18.0-2, km 100+053, L=30.0 m (Composite).
Client: FBiH Roads Directorate; Contract duration: 23.07.2003 to 07.09.2003.

Final design of reconstruction and strengthening (improving the load bearing class) of bridge Gostelja on the main Road M-18.
Client: FBiH Roads Directorate; Contract duration: 04.07.2003 to 11.08.2003.

Final design of rebuilding and strengthening (improving the load bearing class) of bridge across River Grabarska in Velika Kladuša and final design of completing the bridge across River Kladušnica in Velika Kladuša on the Main Road M-4.2.
Client: FBiH Roads Directorate; Contract duration: 04.07.2003 to 05.08.2003.

Final design of reconstruction of two bridges across River Bosna on the regional road R-445, section Semizovac – Podlugovi – one in Malešici, L=107 m, and other in Donja Vogošca, L=74 m.
Client: FBiH Roads Directorate; Contract duration: 13.07.2001 to 31.07.2001.

Final design of bridges rebuilding in Kamenica, L=20.0 m (composite structure), and in Rejševa, L=20.0 m (composite structure), on the regional road R 473, section Teslic – Blatnica.
Client: Metalno - Zenica; Contract duration: 11.07.2001 to 15.08.2001.

Final design of reconstruction of bridge across River Bosna on the M 17 main road near Nemila (Doboj – Zenica section), L=285.0 m.
Client: FBiH Roads Directorate; Contract duration: 19.02.2001 to 03.03.2001.

Final design of reconstruction of Bocac tunnel on the main road M-16 near Jajce, L=106.0 m.
Client: FBiH Roads Directorate; Contract duration: 30.08.2000 to 30.09.2000.

Final design of bridge rehabilitation in Sanski Most on the regional road R-415, L=22.0 m (reinforced concrete).
Client: Cantonal Ministry of Transport and Communications of Unsko-sanski Canton; Contract duration: 11.08.2000 to 25.08.2000.

Final design of rebuilding and site supervision of bridge across River Bliha in Sanski Most on the main road M-15, L=46.0 m (prestressed concrete).
Client: PID Transport; Contract duration: 12.07.2000 to 31.12.2000.

Top


Bridge Site Supervision of 15 Standard Bridges

Technical supervision over renewal of bridge across River Raca and local road on main road M-18.0, section Šicki Brod – Sarajevo in town of Srednje.
Client: P.C. Road directorate of FBiH and EFOR; Contract duration: 15.07.2007 to 15.11.2007.

Technical supervision over renewal of bridge across Brook Drecelj on main road M-17.0, section Sarajevo – Jablanica in Konjic.
Client: P.C. Road directorate of FBiH; Contract duration: 20.03.2007 to 05.07.2007.

Technical supervision over renewal of viaduct near Kladanj on main road M-18.0-2 Šicki Brod – Sarajevo.
Client: P.C. Road directorate of FBiH and EUFOR; Contract duration: 21.08.2006 to 18.12.2006.

Technical supervision over renewal of bridge across River Drinjaca in Kladanj on main road M-18.0-2, Šicki Brod – Sarajevo.
Client: P.C. Road directorate of FBiH; Contract duration: 18.07.2006 to 15.11.2006.

Supervision of works made on rebuilding of bridge over River Ljubina on main road M 18 section Šicki Brod – Sarajevo, km 100+058.
Client: FBiH road directorate and SFOR; Contract duration: 08.06.2004 to 18.10.2004.

Supervision of works made on rebuilding of bridge across River Grabarska in Velika Kladuša on road M-14.1 and of completing the bridge across River Kladušnica and part of the road on bridge approaches in Velika Kladuša on M-14.1.
Client: FBiH roads directorate; Contract duration: 03.03.2004 to 07.05.2004.

Supervision of bridge «Gostelja» reconstruction on the main road M-18 Šicki Brod – Sarajevo at km 22+950.
Client: FBiH Roads Directorate; Contract duration: 02.12.2003 to 04.04.2004.

Supervision of the “Ugar 3” Bridge rebuilding on the regional Road R-413, Turbe – Skender Vakuf section.
Client: FBiH Roads Directorate; Contract duration: 10.10.2003 to 12.12.2003.

Supervision of bridge construction across River Sanica on regional road R-410 in Vrhpolje.
Client: Unsko – Sanski Canton government; Contract duration: 07.07.2003 to 17.10.2003.

Supervision of reconstruction viaduct Stanovi on the main road M-18, near place Stupari,
Client: SFOR and FBiH Roads Directorate; Contract duration: 04.10.2002 to 04.12.2002.

Supervision of reconstruction of bridge across River Bosna on the main road M-17 near Nemila.
Client: FBiH Roads Directorate; Contract duration: 05.06.2003 to 05.07.2003.

Supervision of works made on rehabilitation of bridges across River Bosna in Donja Vogošca and Malešici on local R-445 Semizovac – Podlugovi.
Client: FBiH Roads Directorate and Cantonal road directorate Sarajevo; Contract duration: 19.02.2002 to 01.04.2002.

The site supervision of rebuilding of Otoka road across River Una in Bosanska Otoka on the main road M-14 (steel truss);
Client: FBiH Roads Directorate – contractor Traser Sarajevo; Contract duration: 12.07.2000 to 12.12.2000.